WAREHOUSING
Between 2015 and 2022 Lawson Projects has provided project management services for the construction of 365,185m2 (approx. 4,000,000 sq. ft.) of Industrial Distribution Centres within High Plains Industrial Park, Rocky View County, AB:
|
Peak Products Distribution Centre, Rocky View County, AB
The Peak Products Distribution Centre is a 16,604m2 (178,730 sq. ft.) build-to-suit facility with 13,285m2 (143,000 sq. ft.) of space for future expansion. Located in High Plains Industrial Park, construction began in August 2021 and is expected to be complete in June 2022.
CHEP Distribution Centre, Rocky View County, AB
Courtesy of CIMA+
|
The CHEP Distribution Centre is a 13,935 m2 (150,000 sq. ft.) build-to-suit facility with a 17,400 m2 (187,300 sq. ft.) storage area, located in High Plains Industrial Park. Construction began in June 2020 and was completed February 2021.
|
Lowe's Distribution Centre, Rocky View County, AB
High Plains Building 3, Rocky View County, AB
High Plains Building 3 will be a 38,031 m2 (409,360 sq. ft.) Warehouse in High Plains Industrial Park. Construction began in September 2019 and was complete August 2020.
Two tenants now occupy the building; AOSOM and Conagra Brands Canada Inc. AOSOM is leasing 15,660 m2 (168,560 sq. ft.) on the north side of the building. Conagra Brands Canada Inc. is leasing the remaining 22,371 m2 (240,800 sq. ft.) |
Gordon Food Services (GFS), Rocky View County, AB
Calgary Regional Distribution Centre - Lawson Projects successfully delivered a the 27,943 m2 (300,775 sq. ft.) Distribution Centre for GFS Calgary on a 10 ha site in High Plains Industrial Park in Balzac, AB.
Edmonton Regional Distribution Centre Upgrades and Expansion – Lawson Projects successfully delivered a 10,121 m2 (108,941 sq. ft.) addition, along with interior upgrades to an existing building forming part of the existing GFS regional Distribution Centre in Edmonton.
Edmonton Regional Distribution Centre Upgrades and Expansion – Lawson Projects successfully delivered a 10,121 m2 (108,941 sq. ft.) addition, along with interior upgrades to an existing building forming part of the existing GFS regional Distribution Centre in Edmonton.
Congebec, Calgary, AB
In 2017 Conqubec planned to expanded their current Calgary freezer facility by approximately 6,800 m2 (73,194 sq. ft.). The building addition was constructed while the the current facility was in full operation. Lawson Projects was retained to guide the project through construction, handover and into the warranty phases. The expansion included a 300 m2 (3229 sq. ft.) mezzanine.